A R C H I T E C T U R E   -   D E S I G N   -   P L A N N I N G

  • Franklin Savings Bank
  • Gov. Connection
 

 

     
 

   

After an extended search , the owner decided to “build an old mill from scratch”  for the following reasons:

  • Lack of available space in the preferred location.
  • A desire to provide an optimal light, airy work environment for hard-to-retain high-tech employees.
  • Intense technical and connectivity requirements; the complete computer support of up to 400 other mid-sized companies will be “hosted” from this remote location.

Project team members

 


AG Edwards & Sons    New London, NH

 

Managed OPS.Com 
Bedford, NH  

 Nobis Engineering  Concord, NH

 

 PC Connection Merrimack, NH

 

 

 

© 2007 Sheerr McCrystal Palson Architecture, Inc. All rights reserved